home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT / DAILY_1 / 930301.DFC < prev    next >
Text File  |  1993-03-02  |  8KB  |  220 lines

  1.  
  2.  
  3. 01-Mar-93 Daily File Collection
  4.    These files were added or updated between 28-Feb-93 at 21:00:00 {Central}
  5.                                          and 01-Mar-93 at 21:00:34.
  6.  
  7. =--=--=START=--=--= NASA Spacelink File Name:930301.SHU
  8.  
  9. KSC SHUTTLE STATUS 3/1/93 
  10.  
  11.  
  12.  
  13.               SPACE SHUTTLE DAILY STATUS-STS 55
  14.                  Monday, March 1, 1993
  15.  
  16. George H. Diller
  17. Kennedy Space Center
  18.  
  19.  
  20. Vehicle: OV-102/Orbiter Columbia    Mission: STS-55
  21. Current location: Pad 39-A          Orbital altitude: 184 sm
  22. Payload: Spacelab D-2               Inclination: 28.45 degrees
  23. Launch timeframe: March 14  10 a.m. Landing: KSC 3/23  8:05 a.m.
  24. Mission Duration: 8 days 22 hours   Crew size: 7
  25.  
  26.  
  27. STS-55 IN WORK:
  28.  
  29. - alignment of orbiter Inertial Measurement Units (IMU)
  30. - main engine eyelid installation
  31. - GAS can experiment battery charging at Hangar S
  32.  
  33.  
  34. STS-55 WORK SCHEDULED:
  35.  
  36. - begin contingency EVA spacesuit installation overnight tonight
  37. - Flight Readiness Test (FRT) on Tuesday
  38. - Helium Signature leak check on Wednesday
  39. - begin stowage of flight crew equipment into crew cabin Wed.
  40. - hypergolic propellant loading Thursday and Friday
  41. - begin aft compartment closeouts Saturday
  42. - reinstall GAS can experiments Saturday
  43. - primary orbiter refrigerator/freezer
  44.   interface verification test (IVT) pending
  45.  
  46.  
  47. STS-55 WORK COMPLETED:
  48.  
  49. - leak checks of liquid oxygen high pressure turbopumps
  50. - main engine heat shield installation
  51. - reinstall GAUS experiment film magazine
  52. - removal of GAS cans for experiment battery charging
  53.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  54. =--=--=-END-=--=--=
  55.  
  56. =--=--=START=--=--= NASA Spacelink File Name:930301.SKD
  57.  
  58. DAILY NEWS/TV SKED 3/1/93 
  59.  
  60. Daily News
  61. Monday, March 1, 1993   
  62. Two Independence Square, 
  63. Washington, D.C.       
  64. Audio service: 202/358-3014
  65.  
  66.  
  67.  
  68.  % STS-55 Launch date set;
  69.  % Galileo Update;
  70.  % Magellan mission status.
  71.         
  72. NASA managers scheduled March 14, 1993 as the launch date for Shuttle Mission
  73. STS-55. Space Shuttle Columbia and her seven-member crew will fly a mission
  74. dedicated to the German Space Agency.
  75.  
  76. The major payload, Spacelab-D2, will allow the astronauts to perform a wide
  77. range of experiments in the microgravity environment of space.  About 90
  78. experiments are planned during the mission.
  79.  
  80. The launch window extends from 10 a.m. until 12:30 p.m.  EST. The STS-55 crew
  81. will be divided into two teams.  Each team will work a 12-hour shift to allow
  82. science operations to be carried out around the clock.  The Spacelab-D2 mission
  83. will last 9 days and will conclude with a landing at the Kennedy Space Center's
  84. Shuttle Landing Facility.
  85.  
  86. * * * * * * * * * * * * * * * *
  87.  
  88. Galileo, which is enroute to Jupiter is performing well, although the high-gain
  89. antenna is still only partly deployed.  Galileo is transmitting science and
  90. engineering data via the low- gain antenna.  The spacecraft is scheduled to go
  91. into orbit on December 7, 1995.  The Project is now planning the Jupiter
  92. mission and the August 1993 encounter with asteroid Ida assuming dependence on
  93. the low-gain antenna.
  94.  
  95. * * * * * * * * * * * * * * * *
  96.  
  97. Magellan, which was launched on May 4, 1989, is continuing its survey of the
  98. gravitational field of Venus. The spacecraft is utilizing precise navigation in
  99. the near-Venus portion of its orbit through May 15, 1993.  Magellan has
  100. radar-mapped more than 99% of Venus's surface from September 1990 to September
  101. 1992.
  102.  
  103.  
  104.  
  105. Here's the broadcast schedule for Public Affairs events on NASA Select TV. Note
  106. that all events and times may change without n are Eastern. Live indicates a
  107. program is transmitted live.
  108.  
  109.  
  110. Monday, March 1, 1993
  111.  
  112. Live    12:00 pm   NASA Today news program; includes stories on appointment of
  113.                    Joseph Shea to oversee redesign of Space Station Freedom;
  114.                    Topex/Poseidon report; a LeRC fuel-effecient engine; DOE's
  115.                    National Science Bowl
  116.         
  117.         12:15 pm   Aeronautics and Space Report.
  118.         
  119.         12:30 pm   Pictures in the Mind.
  120.  
  121. Live    1:00  pm   Images of the Universe from the HST
  122.         
  123.         1: 30 pm   Ingredients for Space Travel
  124.         
  125.         2:00  pm   Starfinder #7
  126.         
  127.         2:30  pm   Our Star, the Sun
  128.         
  129.         3:00  pm   TQM #46
  130.  
  131. Tuesday, March 2, 1993
  132.  
  133. Live    12:00 pm   NASA Today news program;                         
  134.  
  135.         12:15 pm   Aeronautics & Space Report
  136.  
  137.         12:30 pm   Looking Ahead and Back
  138.  
  139.         1:00 pm    STS-55: the D-2 Project
  140.  
  141.         1:30 pm    Kids in Space: Project Space Shuttle
  142.  
  143.         2:00 pm    Starfinder #8
  144.  
  145.         2:30 pm    Mercury: exploration of a Planet
  146.  
  147.         3:00 pm    TQM #47
  148.  
  149.  
  150.         
  151. NASA Select TV F2R, transponder 13, C-Band, 72 degrees West Longitude,
  152. transponder frequency is 3960 MegaHertz, audio subcarrier is 6.8 MHz,
  153. polarization is vertical.
  154.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  155. =--=--=-END-=--=--=
  156.  
  157. =--=--=START=--=--= NASA Spacelink File Name:6_2_2_43_7.TXT
  158.  
  159. STS-55 Predicted Keplerian Elements for March 14 launch
  160.  
  161. STS-55
  162. 1 00055U          93073.67556033  .00120200  00000-0  36300-3 0    33
  163. 2 00055  28.4697 228.7025 0003812 314.2100  45.8202 15.90487610    23
  164.  
  165. Satellite: STS-55
  166. Catalog number: 00055
  167. Epoch time:      93073.67556033 =====> (14 MAR 93   16:12:48.41 UTC)
  168. Element set:     JSC-003
  169. Inclination:       28.4697 deg
  170. RA of node:       228.7025 deg          Space Shuttle Flight STS-55
  171. Eccentricity:     .0003812             Prelaunch Keplerian Elements
  172. Arg of perigee:   314.2100 deg         Launch:  14 MAR 93  15:00 UTC
  173. Mean anomaly:      45.8202 deg
  174. Mean motion:   15.90487610 rev/day              G. L. Carman
  175. Decay rate:     1.2020e-03 rev/day~2     NASA  Johnson Space Center
  176. Epoch rev:               2
  177.  
  178. G.L.CARMAN
  179.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  180. =--=--=-END-=--=--=
  181.  
  182. =--=--=START=--=--= NASA Spacelink File Name:6_8_3_4_55.TXT
  183.  
  184. MAGELLAN STATUS 2/26 
  185.  
  186. Magellan Status
  187.  
  188.  
  189. Status Report of Magellan for Friday, February 26, 1993:
  190.  
  191. 1.  The Magellan spacecraft is operating normally under the G3043 command
  192. sequence.  Starcals and desats continue to be very successful.  Spacecraft
  193. temperatures are in the expected range.
  194.  
  195. 2.  During the tracking pass over the Canberra DSN station Thursday morning,
  196. the Magellan telemetry signal was suddenly lost.  The station personnel
  197. reported an increased receiver temperature and speculated that it looked like
  198. the uplink was bouncing off the moon.  A quick check by Eileen Dukes of the
  199. Spacecraft Team, using a planetary ephemeris program on her personal computer,
  200. verified that the moon had indeed occulted Venus and the Magellan signal.
  201.  
  202. 3.  The Magellan Project has been requested to work with the MESUR Project in
  203. finding facility space on the second floor of Bldg. 230 to co-locate the MESUR
  204. personnel in the next few months.  The Project is working a plan to accommodate
  205. this change with minimal impact to preparations for TEX and LMGT.
  206.  
  207. 4.  Magellan has completed 6863 orbits of Venus since August 10, 1990.  We are
  208. now 88 days from the end of Cycle-4 and the start of the Transition Experiment.
  209.  
  210. Magellan is 88 days from the end of Cycle 4.
  211.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  212. =--=--=-END-=--=--=
  213.  
  214. =--=END OF COLLECTION---COLLECTED 4 FILES---COMPLETED 21:23:54=--=
  215.  
  216. ====PRESS RETURN TO CONTINUE====
  217.  
  218.  
  219. Enter an option number, 'G' for GO TO, ? for HELP, or
  220.   press RETURN to redisplay menu...